Every condo project begins with the building, not the design: the HOA’s architectural guidelines, the declaration (what counts as your unit and what’s a common element), and the building’s as-built drawings if they exist. We design around what can’t move, such as plumbing stacks, risers, and load-bearing and demising walls, and reinvent everything else.
Virtually every Charlotte condo building requires HOA approval for work beyond paint and non-plumbed finish changes, and approvals typically take about two to eight weeks depending on the building. We submit in parallel with local permitting rather than after it, including Mecklenburg County permitting for Charlotte buildings and the applicable jurisdiction for buildings in surrounding communities. We then plan the execution: elevator and dock reservations, dust control and hallway protection, daily common-area clean-down, and a single point of contact for the HOA and neighbors. Full-unit renovations commonly run four to nine months from design through completion.
As a design-build firm, the same team that designs your condo builds it, one contract and one point of accountability instead of a handoff between a designer and a contractor who has never worked in a 20-story building. We remodel condos in Uptown, South End, SouthPark, Myers Park, Dilworth, and Ballantyne.